[email protected] Serving India · Bangladesh · Pakistan · Sri Lanka · Nepal
English (South Asia)

High Density Automated Warehouse Storage FIFO & FILO Pallet Radio Shuttle Racking System for Industrial Raw Material Storage

Product Description

Four-way shuttle system overview
Four-way shuttle racking machinery
Jracking's four-way shuttle racking system is an intelligent warehousing solution suitable for high-SKU, high-density storage. Through the coordinated operation of four-way shuttles, elevators, and a WMS/WCS management system, the system achieves automated storage and retrieval and intelligent scheduling of palletized goods, significantly improving warehouse space utilization and operational efficiency. The four-way shuttles can move forward, backward, and laterally within the racking aisles and operate between different levels via elevators, reducing forklift aisle requirements. This makes it particularly suitable for space-constrained warehousing scenarios with frequent goods turnover.
Automated shuttle system details
Product Specifications
Name Radio shuttle system Material Q235B/Q355B
Size Customized Size Color Customized
Depth Customized Weight Capacity 2000kg/pallet
Width Customized Height Customized
Finish Powder Coated
Usage Warehouse Storage System
Packing Customers' Request
Certification AS4084-2012 / CE / ISO / RMI
Free Sample Available (Delivery Cost on Buyer)
OEM Available
Shuttle components overview
What types of goods are suitable for storage?
No requirements for variety

The inventory relies on intelligent systems with strong picking ability, and the variety and location of goods are digitized.

Cold storage (-25~5°C)

Reduce low-temperature operation time, improve work efficiency and safety.

Existing warehouse upgrade

The shape of the old warehouse is usually irregular and suitable for using four-way vehicles to improve space utilization.

Dense Storage

A warehouse with limited storage space that requires maximum utilization of space.

Pallet goods

Although there is no requirement for the type of goods, they need to be packaged into a uniform pallet style.

Unmanned warehouse

Entry and exit can be achieved through automated equipment and systems.

Irregular warehouse

The shape of the warehouse is not standard, and the shelves can be arranged according to the shape of the warehouse.

Cross floor

Elevators, conveyor lines, etc. can be used to uniformly dispatch goods from different warehouses and floors.

Four-way shuttle technical demonstration
Warehouse shuttle racking system
Automated shuttle racking facility
Dense warehouse storage
Shuttle operation view
Storage rack detail
Industrial racking layout
Warehouse racking view
High density warehouse installation
Automated shuttle unit
Shuttle rail view
Four-way shuttle system detail
Production and quality control
Manufacturing process
Workshop overview
Factory logistics
Product line categories
Frequently Asked Questions
Q1 What are your trading terms?
1) Payment terms: T/T 30% deposit after order confirmed, 70% balance paid against bill of lading. L/C and O/A are also available.
2) Lead time: Normally in 20-25 days after deposit received.
3) Sample policy: Samples are always available for each model. Samples can be ready in 7-15 days once payment received.
4) Shipping port: Shanghai / Nanjing, China.
5) Discounts: We offer attractive discounts for large quantities.
Q2 How can I arrange delivery for my goods?
1) Sea freight: We will update sea freight rates once we know your destination sea port.
2) Client-designated agent: Please provide the contact details of your forwarder/shipping agent, and we will coordinate delivery with them directly.
Q3 What services does Jracking provide?
1) Inquiries related to our products or prices will be responded to within 12 hours.
2) Well-trained and experienced staff to address all inquiries in fluent English.
3) OEM & ODM services available to help design customized racking configurations.
4) Experienced professional engineering team dedicated to providing optimal logistics solutions.
Q4 What is the product purchasing process?
Design drawing → Confirm drawing → Quotation → Proforma Invoice (PI) → Confirm PI → Arrange 30% deposit → Manufacture → QC inspection → Pay balance → Shipping
Q5 What are your core advantages?
1) Flexible payment: O/A terms of 40-60 days available.
2) Rapid lead time: Fast delivery capability for rush orders.
3) Direct factory pricing: Competitive pricing direct from the manufacturer.
4) Reliable warranty: Two-year warranty with direct replacement for damaged parts.
Q6 Does Jracking have a Minimum Order Quantity (MOQ) limitation?
No strict MOQ is required, though volume orders benefit from better pricing. For standard products, we recommend ordering in quantities suitable for at least one 20ft container (approx. 15 tons) for optimal shipping economics.

Related Products