[email protected] Serving India · Bangladesh · Pakistan · Sri Lanka · Nepal
English (South Asia)
EN 15512 / CE Certified Industrial Storage Systems

CE Certified Push Back Racking Manufacturer & Exporters Serving the United Arab Emirates Market

High-density dynamic cart storage engineered for Dubai, Abu Dhabi, Sharjah & UAE Free Zones. Maximize warehouse cubic volume by up to 75% with zero aisle wastage.

Engineered Warehousing Portfolios

High-Density Racking & Pallet Storage Systems

Explore our industrial-grade storage solutions, purpose-built with certified high-yield structural steel, automated robotic welding, and anti-corrosive electrostatic powder coatings for Middle Eastern supply chains.

Selective Pallet Heavy Duty Industrial Storage Warehouse Rack Selective Pallet Racking Shelves

Heavy Duty Selective Pallet Racking Shelves

100% immediate selectivity for high-throughput multi-SKU distribution hubs across Jebel Ali Free Zone (JAFZA) and Dubai South.

Up to 4,500 kg / beam View Details →
Roll & Textile Removable Folding Metal Cloth Roll Stacking Rack

Removable Folding Metal Cloth Roll Stacking Rack

Collapsible modular metal pallets designed for high-density coiled material and roll storage, maximizing seasonal floor space.

Stackable 4-5 Tiers View Details →
Automated AS/RS SHUNLI SL-AS004 Heavy Duty Automated ASRS Pallet Stacking Rack

SHUNLI SL-AS004 Heavy Duty AS/RS Stacking Rack

Fully automated alloy steel high-bay retrieval storage racking configured for 500kg-1500kg payloads under smart WMS management.

500kg - 1,500kg OEM View Details →
Corrosion Proof Heavy Duty Anti Rust FRP Storage Rack

Heavy Duty Anti-Rust Chemical & FRP Storage Rack

Engineered for high humidity, water treatment, chemical warehousing, and coastal operations in Sharjah and Ras Al Khaimah.

300kg / 4-Layer Spec View Details →
Heavy Shelving Factory Custom Adjustable Storage Shelves Heavy Duty Shelving Unit

Custom Adjustable Heavy Duty Storage Shelves

Flexible beam level positioning with heavy-gauge decking for bulk parts picking, fulfillment centers, and maintenance depots.

Adjustable Pitch 50mm View Details →
Pallet Flow Industrial Pallet Flow Rack Roller Track

Industrial Storage Pallet Flow Rack Roller Track

Strict FIFO gravity-driven roller bed systems with dynamic braking rollers, perfect for food & beverage and pharmaceutical dates.

Heavy Rolling Rails View Details →
Boltless Rack Boltless Adjustable Heavy Duty Steel Storage Racking

Boltless Adjustable Industrial Steel Racking System

Interlocking structural design providing rapid modular assembly, exceptional lateral rigidity, and high load capacity without bolts.

500kg / Layer Certified View Details →
Radio Shuttle Intelligent Shuttle Pallet Racking Warehouse Storage System

Intelligent Shuttle Pallet Racking Storage System

Semi-automated deep lane shuttle cart racking for high-density FMCG, cold storage buffers, and e-commerce distribution facilities.

Multi-Depth FIFO / LIFO View Details →

Executive Engineering Summary: Dynamic Push Back Racking Mechanics

Push Back Racking represents the pinnacle of high-density dynamic storage engineering for modern logistics infrastructures. By incorporating a series of nested, inclined steel carts running along inclined structural rail channels, the system facilitates Last-In, First-Out (LIFO) pallet handling across lanes 2, 3, 4, 5, or 6 pallets deep. Unlike standard drive-in systems where lift trucks must enter deep structural bays—introducing severe frame impact risks and slowing down cycle times—push back racking operations occur entirely at the front picking face. The forklift operator simply deposits a pallet onto the top cart; when loading the subsequent pallet, the mast gently pushes the existing pallet back to reveal the next nested cart underneath. Upon unloading, gravitational velocity is safely counter-regulated by cart slope design (typically a calibrated 2.5% to 3% decline), presenting the rear pallet smoothly at the picking aisle face.

+75%
Storage Density Gain
0%
Internal Bay Collisions
-35%
Pallet Put-Away Cycle Time
EN 15512
CE European Standard

Nested Cart Kinetic Dynamics

Each push back lane comprises heavy-gauge structural channel rails housing precision-machined, sealed flanged steel ball bearings. Nesting low-profile welded carts sit over one another at step-down elevations, ensuring total vertical clearance efficiency. As carts telescope in and out, anti-lift interlocks prevent cart derailment even under uneven pallet placements or sudden forklift braking.

Civil Defence In-Rack Fire Flue Compliance

A crucial design bottleneck for high-bay warehousing across the UAE (Dubai Civil Defence - DCD, ADCD) is vertical fire flue integrity. Our push back racking systems incorporate calculated 150mm transverse and 75mm longitudinal flue clearance buffers. This geometry ensures in-rack ESFR ceiling-level sprinkler water distribution satisfies NFPA 13 regulations without mandatory internal water pipe installation up to 9 meters.

Dual Euro & GMA Pallet Compatibility

UAE logistics hubs process an intersection of inbound freight from Europe, North America, and Asia. HEDA push back systems are fabricated with dual-direction cart flanges capable of securely nesting both European standard 1200x800mm pallets and ISO/GMA 1200x1000mm standard industrial skids without intermediate beam deflections or off-track jamming.

Storage System Type Space Utilization SKU Selectivity Aisle Requirements Forklift Damage Risk Cold Store Operating Cost
Push Back Racking (2-6 Deep) 80% - Very High 1 Lane = 1 SKU (High) Single Front Aisle Only Minimal (External Only) Lowest Energy / Pallet
Drive-In Racking 85% - Maximum 1 Bay = 1 SKU (Low) Drive-Thru Internal Aisles Extreme (Mast Impacts) Moderate
Standard Selective Racking 40% - Low 100% Immediate Wide Aisles (3.2m - 3.8m) Low to Moderate High Air Volume Cooling
Radio Shuttle Automation 85% - Very High Per Channel Control Dedicated Lift Aisle Very Low Battery Chill Degradation
Regional Integration

High-Density Applications Across UAE Free Zones & Hubs

Industrial real estate lease rates in Dubai and Abu Dhabi have surged by over 30% in recent cycles. Learn where our push back systems deliver maximum ROI across UAE industrial jurisdictions.

JAFZA Logistics Corridor & Bonded Depots

In Jebel Ali Free Zone (JAFZA) South and North, freight forwarders handle fast-moving containerized break-bulk cargo. Push back configurations allow 3-deep and 4-deep staging behind cross-dock doors, reducing transit distances between de-stuffing bays and rack storage without locking warehouse floor lanes.

JAFZA North JAFZA South 3PL Consolidation Bonded Cargo

Dubai South & DWC Aerotropolis (FMCG)

Positioned around Al Maktoum International Airport (DWC), international e-commerce operators and retail distribution centers deploy push back racking to consolidate medium-velocity inventory lines (e.g., consumer electronics, cosmetics, packaged food) where 3 to 10 pallets exist per SKU.

Dubai South EZDubai Hub DWC Cargo Gateway E-Commerce

Cold Chain Hubs in KEZAD (Abu Dhabi)

Under the UAE National Food Security Strategy 2051, Khalifa Economic Zones Abu Dhabi (KEZAD) has expanded massive temperature-controlled zones (-25°C to +4°C). The immense electrical expenditure required to chill cubic meters in 50°C UAE summers makes push back racking essential to maximize cubic density.

KEZAD Food Zone Deep Freeze (-25°C) Chilled Pharma Khalifa Port

Sharjah & Ajman Light Industrial Estates

Small-to-medium enterprises in Industrial Areas 1 to 18 (Sharjah) and Jurf (Ajman) operating in metal fabrication, building hardware, and packaging face ceiling height limits (6m to 8m). A 2-to-3 deep push back racking retrofit doubles existing pallet counts without requiring expensive civil expansion.

Sharjah Ind. Area Jurf Ajman Building Supplies Modular Retrofit

Dubai Industrial City (DIC) Manufacturing

Large manufacturing plants in DIC producing packaging, plastics, cables, and fast-moving beverages utilize 5-deep push back systems directly interfacing with production line staging buffers, mitigating forklift bottlenecks during high-volume shift turnarounds.

DIC Dubai Beverage Staging Buffer Storage Heavy Pallets

Pharmaceutical & Medical Reserves (DAFZA)

Dubai Airport Freezone (DAFZA) healthcare distributors handle high-value temperature-controlled drugs requiring strict batch quarantine. Push back lanes allow distinct lane-by-lane batch assignment, preventing inadvertent cross-contamination between lot numbers.

DAFZA Logistics Batch Segregation MOHAP Compliance GDP Certified
Market Evolution

Macro Logistics Trends & Racking Evolution in the UAE

The transformation of the United Arab Emirates into a global re-export powerhouse is reshaping the engineering criteria for warehouse storage infrastructure.

Escalating Warehouse Land Lease Premiums

Driven by the "Operation 300bn" industrial strategy and record foreign direct investment, Grade-A warehouse occupancy in Dubai and Abu Dhabi exceeds 96%. With square-meter rental rates steadily increasing, warehouse operators can no longer afford wide 3.5m aisles for selective racking. Push back systems reclaim up to 55% of floor area otherwise lost to forklift maneuvering lanes, drastically reducing the real estate cost per pallet position stored.

Cold Chain Decarbonization & Efficiency

Under the UAE's Net Zero by 2050 strategic initiative, refrigerated storage facilities face rigorous power efficiency audits. Cooling an empty cavernous aisle consumes the exact same kilowattage as cooling stored frozen pallets. By consolidating inventory into tightly packed push back matrices, cold storage operators eliminate unproductive cubic air voids, reducing chiller compressor loads by up to 22%.

Stringent HSE & Civil Defence Standards

The UAE has implemented stringent warehouse safety and seismic enforcement guidelines. Traditional cheap racking imports often buckle under standard reach truck knocks. Push back systems eliminate structural bay entry completely: forklift tines never enter the rack interior, drastically decreasing catastrophic rack collapse hazards and ensuring rapid compliance during annual municipality safety audits.

Procurement Knowledge Base

Frequently Asked Questions by UAE Warehouse Engineers

Critical engineering, regulatory, and shipping considerations addressed for logistics managers, facility directors, and procurement specialists across the Emirates.

Will our push back racking pass Dubai Civil Defence (DCD) inspection?

Yes. Our push back racking designs strictly conform to NFPA 13 and local Civil Defence guidelines across Dubai, Abu Dhabi, and Sharjah. We engineer transverse flue spaces (minimum 150mm between double-back rows) and longitudinal flues to allow unimpeded heat detection and ESFR ceiling sprinkler water penetration. Detailed structural calculation reports and PE stamping can be coordinated for municipal building approval.

How does the system withstand the UAE's high coastal humidity and salinity?

Steel profiles undergo an automated 9-stage pre-treatment wash involving chemical pickling, surface degreasing, and zinc phosphating prior to electrostatic polyester powder coating. The resulting cure provides high scratch and chemical resilience. For open sheds, coastal zones in Jebel Ali or Hamriyah, or cold rooms, hot-dip galvanized carts and zinc-plated structural rails are custom specified.

What concrete floor slab rating is required for heavy push back installations?

Push back racking concentrates heavy static and dynamic point loads on upright baseplates. Typically, a reinforced slab thickness of 160mm to 220mm with a minimum compressive strength of C30/37 or 35 N/mm² is required. For leased sheds across Al Quoz or Ras Al Khor with unverified slab drawings, our structural engineers calculate enlarged steel spreader baseplates and M12/M16 chemical anchoring.

Can standard counterbalance forklifts operate with push back racking?

Yes. Any standard electric counterbalance forklift, reach truck, or articulated Bendi/Aisle-Master forklift can interface with push back systems. Specialized attachments are unnecessary. The forklift only requires sufficient mast tilt and tractive thrust to push back nested carts loaded up to 1,500kg per pallet position during entry.

What is the typical shipping lead time to Jebel Ali Port or Khalifa Port?

From our Guangzhou manufacturing facility, containerized shipments depart via direct ocean freight lines (COSCO, MAERSK, CMA CGM) with transit times averaging 14 to 18 days to Jebel Ali Port (Dubai) or Khalifa Port (Abu Dhabi). Production time typically ranges between 15 to 25 days depending on project tonnage.

Do you supply installation drawings and on-site engineering supervision?

Every shipment is packaged with numbered steel components, 3D CAD isometric assembly schematics, torque specifications, and step-by-step video guides. For mid-to-large-scale logistics warehouses across the UAE, we can dispatch bilingual on-site site supervisors or coordinate with certified local UAE installation rigging contractors.

Manufacturing Excellence

Guangzhou Heda Shelves: Manufacturing Scale & Quality Control

Operating since 2001, Guangzhou Heda Shelves Co., Ltd. controls the complete manufacturing lifecycle—from prime steel coil slitting to precision roll forming, automated robotic welding, and export sea-worthy packaging.

Direct Factory Industrial Manufacturing Strengths

We eliminate third-party trading markups by supplying directly from our heavy industrial production base in Guangzhou, delivering audited European standards at competitive landed rates.

30,000 m² Facility

Modernized manufacturing hub housing automated cold-roll forming lines, continuous punching presses, and multi-axis welding robots.

30,000 Tons Monthly

High-volume processing capacity ensuring rapid turnaround times even on multi-thousand pallet position logistics tenders.

CE Certification 2435

Full CE Marking compliance (No. 2435-CPR-8605159), ISO 9001:2015 quality management, and RoHS compliant steel coatings.

10,000+ Global Projects

Over two decades of verified racking installations across 120+ countries, with deep project experience across the GCC region.

Accelerate Your UAE Warehouse Storage Capacity

Submit your facility dimensions or CAD architectural layout. Our senior structural racking engineers will prepare a complimentary 2D/3D push back layout, capacity calculation, and detailed CIF Jebel Ali / Khalifa Port quotation within 24 hours.

CE Certified No. 2435-CPR-8605159
ISO 9001:2015 Registered
EN 15512 Racking Calculation Spec
Direct Container Sea Freight to UAE