| Item | Heavy Duty Pallet Flow Racking |
| Style | FIFO Racking System |
| Material | Grade Q235/Q345 |
| Certification | ISO9001 |
| Standard Color | Blue (RAL5017), Orange (RAL2004), Green (RAL6000), Light Grey (RAL7035), Yellow (RAL1037) |
| Access Style | High Accessibility & Selectivity |
| Adjustable Pitch | 50mm, 50.8mm, 75mm, 76.2mm |
| Finishing | Powder Coated Or Galvanized |
| Application Environment | Normal Temperature Or Freezer |
| Back-up Service | Installation Drawing / On Site Instruction |
| Design Service | Free CAD Service Available |
| Lead Time | 3 Weeks for 2*40' Container |
| Standard Package | Palletized, Export-Purpose Packaging |
| Container Load | 10-15 tons / 1*20' container, 20-25 tons / 1*40' container |
| Trade Term | EXW / FOB / CNF / CIF |
The system operates on a First-In, First-Out (FIFO) principle. Pallets are loaded onto slightly inclined roller tracks from the rear loading aisle and slide smoothly toward the picking front driven by gravity, providing high storage density and inventory rotation.
Yes, our pallet flow racking is engineered for versatile application environments, performing reliably in both standard ambient temperatures and harsh cold storage or freezer environments.
Yes, we provide free CAD layout design services based on your facility requirements, accompanied by detailed installation drawings and optional on-site engineering instructions.
Our racks are manufactured using high-strength Grade Q235 and Q345 steel. To resist corrosion and wear, we provide durable electrostatic powder coating or hot-dip galvanized finishing options.
Our standard manufacturing lead time is approximately 3 weeks for an order volume equivalent to two 40-foot containers, ensuring swift turnaround and reliable logistics handling.
We offer pitch sizes of 50mm, 50.8mm, 75mm, and 76.2mm, with standard RAL finish colors including Blue (RAL5017), Orange (RAL2004), Green (RAL6000), Light Grey (RAL7035), and Yellow (RAL1037).