Attic Loft Pallet Rack Steel Structure Mezzanine Platform
- Load Capacity: 300 - 1000 kg / sqm
- Upright Pitch: 50mm / 75mm Adjustable
- Deck Options: Steel, Biconvex, Perforated
- Structural Code: EN 1090-2 / CE Marked
Explore our premier, export-certified warehouse racking portfolios. Fabricated from certified high-tensile structural coil, treated with automated multi-stage pre-phosphating, and finished with electrostatic polyester powder coatings.
Modern industrial supply chains require uncompromising structural integrity. As an internationally certified engineering manufacturer and direct exporter, Guangzhou Heda Shelves Co., Ltd. builds warehouse storage systems that comply rigorously with European Standard EN 15512:2020 (Steel static storage systems - Adjustable pallet racking systems - Principles for structural design), FEM 10.2.02, and British Standard BS EN 15635 (Application and maintenance of storage equipment). A storage system is a specialized civil engineering structure subject to high dynamic and dead loads; structural miscalculations can cause localized deformation, column bucking, or progressive collapse.
Every racking layout we engineer begins with cold-formed, structural-grade steel profiles (chiefly Q235B and Q355B with proven yield points ranging between 235 MPa and 355 MPa). Our multi-axis automated roll-forming lines shape upright posts with continuous Omega-shaped cross-sections. This geometric design provides exceptional torsional rigidity, an optimal radius of gyration, and elevated resistance against forklift mast impacts. Integrated safety claw locks with specialized 3-claw or 4-claw connectors prevent upright beam dislocation under unintended vertical seismic or pallet extraction forces.
| System Classification | Structural Profile Dynamics | Optimal Volumetric Density | Pallet Accessibility Factor | Regulatory Compliance Baseline |
|---|---|---|---|---|
| Selective Pallet Racking | 80–120mm Omega Uprights + Box/Interlocking Beams | Moderate (35% - 40% floor cubic use) | 100% Direct Immediate Selection | EN 15512, RMI MH16.1, AS 4084 |
| Gravity Pallet Flow (FIFO) | Heavy incline beams + Polyurethane impact-damped rollers | Extremely High (65% - 75% floor use) | First-In-First-Out Sequential Discharge | FEM 10.2.06, CE Machinery Directives |
| Drive-In / Drive-Through | Reinforced cantilever arms + Continuous floor guided tracks | High Density (60% - 70% floor use) | LIFO or Channel FIFO Batch Processing | EN 15620 Tolerance Class 400 |
| Mezzanine Industrial Platforms | I-Beam / H-Section Primary + C/Z Purlin Secondary Decks | Multiplies usable area by 200% - 300% | Pedestrian Picking & Light Machinery Floors | EN 1090-2 CE Execution Class EXC2 |
| Radio Shuttle Automation | Precision cold-formed shuttle rails + Rigid box bracings | Maximum Dense Storage (75% - 85% volumetric) | Automated Batch FIFO / LIFO via AGV/Forklift | CE EMC 2014/30/EU, Machinery 2006/42/EC |
Industrial performance depends on the durability of the protective coating. HEDA systems undergo a 10-stage automated pre-phosphating, degreasing, and ultrasonic washing cycle. We then apply an electrostatic thermosetting polyester powder coating with a cure profile exceeding 200°C. For aggressive sub-zero cold-chain facilities or tropical sites characterized by constant marine salinization and monsoonal air, our automated continuous Hot-Dip Galvanizing (HDG) delivers ASTM A123-compliant zinc layers. This provides up to 25 years of maintenance-free service life without cathodic failure.
Global procurement teams are shifting away from standalone, commoditized storage hardware toward engineered, technology-ready racking systems. Industrial facilities must handle higher turnover, rising real estate costs, and integration with automated material handling systems:
Standard racking is evolving to support Autonomous Mobile Robots (AMRs), Automated Guided Vehicles (AGVs), and high-mast cranes. Modern systems require tighter manufacturing tolerances (±1.0mm verticality) to prevent navigation errors during high-speed automated picking.
Global insurance underwriters and structural building authorities now require third-party Finite Element Analysis (FEA). Storage designs must include dynamic seismic calculations that account for local ground acceleration, slab plasticity, and live-load mass displacement.
ESG procurement standards prioritize low-carbon electric arc furnace (EAF) steel alongside durable powder formulations. In refrigerated facilities, high-density shuttle systems reduce the total cubic meters that require cooling, lowering refrigeration energy demand by up to 35%.
Looking ahead, structural storage systems will no longer be purely passive steel frameworks. The industry is adopting embedded sensors and digital monitoring technologies:
Integrated Structural Health Monitoring (SHM): Industrial operations are beginning to install strain-gauge sensors and IoT vibration monitors on critical baseplates and lower-level uprights. These sensors continuously track structural loads, alerting facility managers if structural limits are exceeded or if a forklift impact compromises upright stability.
Digital Twin Engineering & Parametric CAD/CAM: Standard static 2D warehouse layouts are being replaced by dynamic BIM (Building Information Modeling) and digital twins. By simulating cargo movement, turnover cycles, and warehouse airflow in software, engineers can optimize bay clearances, load paths, and floor space utilization before manufacturing begins.
Guangzhou Heda Shelves Co., Ltd. (HEDA Shelves) was established in 2001 and has grown into a premier manufacturing exporter. Our 30,000 m² production complex operates automated roll-forming mills, robotic welding lines, and electrostatic coating plants. We maintain full traceability on every component from raw coil inspection to final shipment.
Our production complies with audited ISO 9001:2015 standards, CE marking (Certification No. 2435-CPR-8605159), and RoHS directives. Clients receive verifiable test reports and mill certificates for project audits and insurance sign-offs.
High-volume manufacturing lines allow us to maintain shorter lead times on large infrastructure projects. Automated CNC punching lines produce consistent hole-pitch accuracy across production runs exceeding 50,000 upright sections.
With completed projects across 120+ countries, we prepare export-packaged, container-optimized shipments with numbered components, detailed 3D assembly guides, and optional on-site engineering supervision.
We calculate all load ratings in accordance with EN 15512 and FEM 10.2.02 codes. Beam deflection limits under uniformly distributed load (UDL) are held to L/200 or lower. We also conduct physical load tests and destructive coupon testing on our automated lines to verify mechanical yield strength and weld penetration.
To produce an engineering layout and CAD proposal, please share: (1) Warehouse architectural drawings showing column grids and clear ceiling heights; (2) Concrete slab thickness, compressive strength, and flatness class; (3) Pallet dimensions (length × width × height) including product overhang and maximum gross weight; (4) Forklift specifications including aisle clearance requirements and maximum reach height.
For standard distribution centers, our 10-stage pre-phosphating wash and high-bake polyester powder coating (60-80 microns thickness) provides reliable corrosion protection. For tropical coastal regions, marine environments, and sub-zero cold-storage facilities, we offer pre-galvanized components or full hot-dip galvanizing to prevent rust at joints, weld seams, and cut edges.
Components are bundled with high-tensile steel strapping, corner protectors, and heavy plastic wrap to secure them during marine transport. Uprights and beams are systematically nested to maximize container space utilization in 20GP, 40GP, and 40HQ configurations, helping reduce freight costs per pallet location.
Yes. Every shipment includes step-by-step CAD installation drawings, labeled component packing lists, and instructional assembly videos. For complex installations such as multi-tier rack-supported mezzanines or automated flow systems, HEDA structural engineers can be dispatched to oversee installation, alignment, and final site commissioning.
Collaborate directly with our engineering team. We typically deliver 2D CAD layout designs, 3D structural renderings, and detailed price breakdowns within 24 hours.
Get a Quote